Client Background
Woldingham School is a prestigious independent girls’ school located in Surrey, with an ongoing investment in expanding and upgrading its facilities. As part of their site development, a new sixth form block was constructed, requiring a reliable and future-proof electrical supply.
Project Overview
AJ Taylor was appointed to design and install a new electrical sub-main supply to power the newly constructed sixth form block, as well as to reconfigure supply to three existing on-site cottages. The new setup would not only meet the immediate demands of the new building but also free up electrical capacity for potential future expansion within the main school building.
Execution
To support the project:
- A new external kiosk was constructed adjacent to the cottages to house the UK Power Networks (UKPN) intake and sub-mains equipment.
- AJ Taylor’s in-house design team developed the layout and specification for the new sub-main infrastructure, which was used by construction partner RPS to build the kiosk and install the underground ductwork.
- New sub-main cables were installed in ducting laid in trenches from the kiosk to the sixth form block and each of the three cottages.
- Due to the length and weight of the cabling, specialist pulling equipment was required, with assistance provided on-site by RPS Construction.
- Temporary power for the sixth form block was provided by a rented generator, making timely completion of the works a priority to reduce ongoing hire and fuel costs.
- Out-of-hours supply changeovers were carried out for the sixth form building to avoid disruption during teaching hours.
- For the occupied cottages, AJ Taylor coordinated directly with residents to schedule changeovers at convenient times, ensuring minimal disruption to their daily routines.
Result
The project was delivered on time and to a high standard, enabling:
- Seamless transition of electrical supply to the new sixth form block and three cottages.
- Disconnection of temporary generator power, reducing operating costs for the school.
- Freed-up electrical capacity in the main school building for future expansion.
- Minimal disruption to students, staff, and residents throughout the process.
- AJ Taylor’s collaborative approach and clear communication with all stakeholders ensured the success of this complex and time-sensitive installation.
🛠 Sector: Education
📍 Location: Woldingham, Surrey
🔌 Services: Electrical Design & Installation, Sub-Mains Infrastructure