Carbon Reduction Plan
Supplier name: A J Taylor Electrical Contractors Ltd
Publication date: September 2023
Commitment to achieving Net Zero
A J Taylor Electrical Contractors Ltd is committed to achieving Net Zero emissions by 2050.
We are currently working to develop a full implementation plan which will allow us to bring this target further forward. All emissions reported and future plans include the entities under A J Taylor Electrical Contractor Ltd’s operational control.
Baseline Emissions Footprint
Baseline emissions are a record of the greenhouse gases that have been produced in the past and were produced prior to the introduction of any strategies to reduce emissions. Baseline emissions are the reference point against which emissions reduction can be measured.
|
Baseline Year: to 20th June 2020 |
|
|
Additional Details relating to the Baseline Emissions calculations. |
|
|
AJ Taylor Electrical Contractors Ltd began collecting emissions data in accordance with the Streamlined Energy and Carbon Reporting (SECR) requirement for the year until 20th June 2020. We have Scope 1 and 2 emissions for two reporting years and have used the year that we feel best represented a usual year of CO2 emissions at the time of reporting. Our Scope 1 emissions include 47.3 tCO2e that has been estimated based on the emissions we have obtained per van for our current year due to not reporting the mileage emissions for our vans at the time of the baseline year. Also for Scope 1 emissions for the Baseline year, the mileage of the vans and receipts was not obtained so have used our most accurate way using the data available which was the number of vans. We worked out an average for the vans for the baseline year based on the emissions per van from our current year and allocated this to each van we had during the baseline time period. Full Scope 3 data has not been collected or reported for the baseline year as this was not required at the time of reporting. Also for Scope 3 emissions, to calculate staff commuting we conducted a survey from our office staff and have used 10% from their work milage for the engineers to allow for home commuting as the engineers, more often than not, include travelling to and from home into their work travelling hour |
|
|
Baseline year emissions: 2019 |
|
|
EMISSIONS |
TOTAL (tCO2e) |
|
Scope 1 |
78.1 |
|
Scope 2 |
2.1 |
|
Scope 3 (Included Sources) |
Not included as not required at the time of baseline year |
|
Total Emissions |
80.2 (Excluding Scope 3 Emissions) |
Current Emissions Reporting
|
Reporting Year: 2022 For Scope 1 emissions, litres of fuel for the commercial cars we own was obtained from fuel cards and for vans was calculated from mileage as this was more accurate than litres of fuel due to not all of the van drivers having fuel cards. We’ve also added 10% to cover fuel that was not tracked on the fuel card by non-engineers with mileage on the jobs with vans driven.
Fow Downstream transportation, as we are using our own fleet to transport goods to the sites from our stores that we install them at, we have left the emissions from this fuel used in Scope 1 emissions. We have not included any Scope 3 emissions for Business Travel as all travel for business is carried out using company owned vehicles. Due to limited information from our Waste Disposal company, we have also based on the emissions for Waste Generation on spend rather than weight and type of waste and this will need to be considered when comparing in future emissions reporting. After switching from Biffa to Veolia waste collection in April 2023, this has also meant we are now sending out general waste to be incinerated and converted to electricity rather than going to landfill, also included in our effort to reduce emissions going forward. The amount of landfill to recycling ratio for Waste in Operations is also not available at this time from our waste collectors, but should be noted for future that for this purposes of these calculations we have assumed a 25% to landfill estimate (on non-recycling items) based on a recent UK Government survey which is hoped to be improved upon by the waste collectors in future. It should be noted that we introduced PV and 2 no. Tesla Powerwall batteries to our building on 01/02/2019 which has decreased our current year Scope 2 emissions. Also that for Downstream Transport emissions, our suppliers did not have full information to provide us with, so whilst this is as accurate as possible, this will need to be accounted for when comparing with future emissions reporting. We envisage more companies will have better access to their emissions in future years and will be able to more quickly and accurately provide this information to better compare in future years to come. We have also done a 50/50 split between artic lorry and LWB van emissions and taken the emissions for the vehicles to be completely our responsibility and not shared with other companies also sharing the vehicle for their deliveries for the time being due to a lack of information, so we know this will be reduced dramatically in the future when everyone has more access to detailed information for this purpose in the future and can provide the share of the material deliveries based on pallet/parcel weight for each company on each journey made. It should also be noted that we have not included the following into our scope 3 emissions at present (as they are not required) for future comparison:
|
|
|
EMISSIONS |
TOTAL (tCO2e) |
|
Scope 1 |
82.758 (REMOVED A THIRD OF GAS EMISSIONS FOR I.T. DEPARTMENT) |
|
Scope 2 |
2.7074183 (REMOVED A THIRD OF ELEC BILLS FOR I.T. DEPARTMENT) |
|
Scope 3 (Included Sources) |
34.65 (25% TO LANDFILL ASSUMED) Business Travel – 0 Employee Commuting – 49.993 Downstream Transportation – 105.72 Upstream Transportation – Included in Scope 1 Emissions |
|
Total Emissions |
275.82841 |
Emissions reduction targets
In order to continue our progress to achieving Net Zero, we have adopted the following carbon reduction targets.
We will reduce our carbon emissions from Scope 1 and 2 emissions to achieve NetZero by 2050 and will put in place interim targets to ensure sufficient progress is made.
We have seen an increase in our reported carbon emissions of 195.62841 tCO2e (a 244% increase) from our baseline year to the current year. This is not a true representation of the impact of our carbon reduction projects and is a result of having been able to capture data for baseline scope 3 emission sources. Our understanding and approach to measuring our environmental impact has increased and will be improved over time and therefor the emissions represent a more accurate picture of our operations, allowing us to take a more holistic approach to reducing GHG emissions.
With a greater understanding of our emission sources, new mechanisms in place to capture additional data, it is recognised that we will need to recalculate our baseline so that we can demonstrate progress on a like for like basis. The intention is to use the reporting year to July ’22 as the revised baseline.
As part of the review of our carbon emissions we will also be considering our target date for achieving Net Zero from 2050 and exploring possibilities to bring this forward. To ensure that we are progressing to plan interim milestones/targets will be established.
Carbon Reduction Projects
Completed Carbon Reduction Initiatives
The following environmental management measures and projects have been completed or implemented since the 2019 baseline. Due to insufficient data gathered at the time of our baseline year for scope 3 emissions, we do not know the exact percentage in decrease reduction of our CO2 emissions since our baseline year, but we do know that the reduction achieved by these schemes equate to 2.249853 tCO2e since our baseline year.
- Appointed a dedicated Renewables Project Manager to facilitate the smooth delivery of larger solar projects.
- Launched an Environmental Policy which outlines our commitment to minimising the negative environmental impact of our activities.
- Facilitated the recycling and re-use of all recycle goods in the office and on site.
- Installed solar panels and 2no. Tesla Powerwall batteries at our offices along with generating 116.34 MWh of green energy (as of 30 August 2023) and reducing our carbon emissions by 2.249853 tCO2e since installation.
- The use of green energy suppliers where possible by investigating the potential of switching tariffs if arrangements allow this in the future.
- Gathered data through SolarEdge solar monitoring system to address priority areas of power consumption.
In the future we hope to implement further measures such as:
Over the next 2 years we plan to build on our existing knowledge and understanding by implementing the following projects:
- Reduce assumptions made in scope 1, 2 and 3 reportable carbon emissions. Establish methodology for capturing better data sources and recalculate baseline emissions for 2022/23.
- Develop a route map for achieving net zero to include:
- achievable GHG reduction targets
- measure and report progress
- identification of cost-effective emission reduction opportunities and commitment to required changes in operations to deliver them, including the upgrade of our solar and solar battery systems.
- identification and management of climate-related risks to our business
- identification and utilization of carbon removal schemes (such as tree planting)
alter full reduction strategies have been applied.
Carbon Reduction Plan | 5 measure and report progress
- Set organisation-wide carbon emissions reduction targets supported by interim targets.
• Set carbon emissions reduction targets and recommending that these are embedded into performance management goals.
• Create a decarbonisation plan for all activities to deliver targets, including applying lessons from various sources.
• Provide support for the sector in understanding the carbon impact of services
• Provide Carbon literacy training to key staff.
• Only as a last resort explore carbon offsetting potential with measures such as membership of Trees for Life.
• Continuing internal communications about the importance of the Net Zero project and engaging ways to encourage colleagues to commit to making changes.
• Developing research projects which will help us in the delivery of net zero emissions.
• Developing an external communications plan, that includes developing website content that highlights how A J Taylor Electrical support the delivery of its clients net zero ambitions.
• In the longer term we will be exploring a range of initiatives with public statements about our commitment to achieving Net Zero
More broadly we will be looking to align with the principles of the ISO14001 Environmental Management Systems standard and will review operations against the standard to identify any compliance gaps. We will continue to work with procurement to understand how to better embed environmental sustainability in procurement processes and contract terms and conditions; and ensure that our own suppliers are able to demonstrate their commitment to achieving net zero by 2050.
Declaration and Sign Off
This Carbon Reduction Plan has been completed in accordance with PPN 06/21 and associated guidance and reporting standard for Carbon Reduction Plans.
Emissions have been reported and recorded in accordance with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard1 and uses the appropriate Government emission conversion factors for greenhouse gas company reporting2.
Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements, and the required subset of Scope 3 emissions have been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard3.
This Carbon Reduction Plan has been reviewed and signed off by the board of directors (or equivalent management body).
Signed on behalf of the Supplier:
A close-up of a signature
Description automatically generated
Date: 21st September 2023