Client Background

Kings Education Brighton is an international sixth form college operating year-round. The building includes teaching spaces, staff offices, student areas, and residential accommodation, all of which require strict adherence to fire safety and compliance standards.

Project Overview

The college identified a number of non-compliant fire doorsets across the building that required replacement. AJ Taylor were appointed to install 27 new fire doorsets throughout the site to bring the building up to current fire safety and compliance standards.

Due to the college remaining fully operational during term time, the works needed to be carefully managed to maintain a safe and functional learning environment throughout the project.

Execution

To minimise disruption, works were delivered through a phased installation programme developed in close coordination with the college’s management team. This approach allowed sections of the building to be upgraded in stages while day-to-day operations continued.

A total of 27 fire doorsets were installed in a range of configurations, including:

  • Single fire doors
  • Double fire doors
  • Leaf-and-a-half glazed fire doorsets

Each doorset was bespoke designed and manufactured to achieve the required fire rating while matching the building’s existing interior design.

In addition to the new installations, remedial works were carried out to 19 riser doors. These upgrades ensured the doors met the required fire performance standards and operated correctly as part of the building’s fire compartmentation strategy.

Result

The phased delivery enabled the college to remain fully operational while essential fire safety upgrades were completed. The building now benefits from fully compliant fire doorsets, improved fire protection, and doors that integrate with the existing design.

Next phase of work

Following the successful completion of the initial phase of fire door upgrades, Kings Education Brighton has commissioned a further phase of works to continue improving fire safety throughout the building.

The upcoming phase will involve the replacement of 72 bedroom fire doors, ensuring that all doors within the residential accommodation areas meet current fire safety compliance requirements. These works will follow the same carefully managed approach used during the previous phase, with installations planned to minimise disruption to students and staff while the college remains fully operational.

This phased programme of works is helping Kings Education Brighton systematically address fire door compliance across the entire site, improving both safety and regulatory compliance while maintaining the operational needs of the college.