Client Background
Cavendish House in Hastings is an NHS facility providing essential healthcare services. Maintaining comfortable internal temperatures is vital for patient care, staff wellbeing, and equipment performance.
Project Overview
AJ Taylor was called to investigate an air conditioning fault affecting two Variable Refrigerant Flow (VRF) condenser units. The issue had caused a complete loss of cooling across the affected areas, resulting in reduced comfort levels and an urgent need for system restoration.
Execution
Our engineers carried out a full diagnostic process and discovered that both VRF condenser units had lost their refrigerant. The leak was traced to capillary tubes that had developed microfractures due to vibration fatigue and corrosion.
Visit 1 – Diagnosis and Preparation
- Leak detection confirmed refrigerant loss from the capillary lines.
- The affected units were safely isolated and decommissioned.
- Replacement capillary tubes were ordered, and a follow-up visit was scheduled.
Visit 2 – Repair and Recommissioning
- Damaged capillary tubes were removed and replaced with new parts.
- Both systems were pressure tested to confirm no further leaks.
- The units were recharged with manufacturer-specified refrigerant.
- Full operational and performance tests were completed to verify balance and efficiency.
After final checks, both condenser units were left running to specification, restoring full cooling capability to the NHS site.
Result
The repair successfully resolved the system fault, restoring reliable air conditioning throughout the facility. Post-repair monitoring confirmed no further leaks or performance issues.
✅ Problem: Refrigerant loss due to leaking capillary tubes.
✅ Solution: Replacement of faulty capillaries, pressure testing, and full system recharge.
✅ Result: Restored functionality and cooling performance for the NHS facility.




