Client Background

Buckingham Park Primary School is an operational school environment where compliance, safety, and minimal disruption are critical. Regular testing of the site’s emergency lighting identified several failed fittings that required remedial works to bring the system back up to standard.

Project Overview

Following the identification of multiple emergency lighting failures during testing, AJ Taylor were appointed to carry out remedial works across the school. The scope of the project involved replacing failed emergency lighting units with new LED fittings to ensure the emergency lighting system met current standards.

Due to the nature of the building and the extent of the works throughout the school, the project needed to be carefully scheduled to avoid disruption to staff and pupils.

Execution

All works were planned and completed during the summer break while the school was not operational. This allowed engineers unrestricted access to all areas of the building and ensured the project could be completed safely and efficiently without impacting the school’s day-to-day activities.

Many of the existing emergency lighting fittings were fluorescent, so particular care was taken to match the new LED replacements as closely as possible. This ensured visual consistency throughout internal areas of the school. In external locations, existing eyelid-style fittings were carefully matched to minimise light spill and avoid disturbance to neighbouring properties and the surrounding area.

Failed fittings were replaced as required, bringing the emergency lighting system back up to standard across the site.

Result

The project was completed within the required timeframe during the summer break. All emergency lighting remedials were successfully carried out, and the school was left with compliant emergency lighting and new LED fittings in place. Buckingham Park Primary School were very pleased with the completed works and the overall result.

  • Date 6th January 2026
  • Tags Commercial, Electrical, emergency lighting, energy efficient, LED lighting, school, Sussex, Worthing
Contact Us
close slider
  • This field is for validation purposes and should be left unchanged.